Bridge structures built by
WKS Grybów
Demolition, reconstruction, expansion and construction of a building structure entitled: “Railway line No. 104 Chabówka – Nowy Sącz on section E from km 61+220 (existing km 63+965) to km 73+892 (existing km 76+652) together with technical infrastructure along railway line No. 104 on the section from km 61+220 (existing km 63+965) to km 73+892 (existing km 76+652), along railway line No. 96 Tarnów – Leluchów on section from existing km 87+700 to existing km 90+345 and at Nowy Sącz station
Design and execution of works for the reconstruction of the bridge in Przemyśl, at km 243.845 of railway line No. 91 Kraków Główny – Medyka as part of the project: “Improvement of the technical condition of engineering structures – Stage II”
Design and execution of works for the task entitled “Reconstruction of the bridge at km 1+968 of railway line No. 22” implemented as part of the project entitled: Works on railway line No. 22 and 25 on the section Gałkówek – Tomaszów Mazowiecki – Radom and on adjacent connecting lines
Demolition, reconstruction, expansion and construction of a building structure entitled: “Railway line No. 104 Chabówka – Nowy Sącz on section E from km 61+220 (existing km 63+965) to km 73+892 (existing km 76+652) together with technical infrastructure along railway line No. 104 on the section from km 61+220 (existing km 63+965) to km 73+892 (existing km 76+652), along railway line No. 96 Tarnów – Leluchów on section from existing km 87+700 to existing km 90+345 and at Nowy Sącz station
Demolition, reconstruction, expansion and construction of a building structure entitled: “Railway line No. 104 Chabówka – Nowy Sącz on section E from km 61+220 (existing km 63+965) to km 73+892 (existing km 76+652) together with technical infrastructure along railway line No. 104 on the section from km 61+220 (existing km 63+965) to km 73+892 (existing km 76+652), along railway line No. 96 Tarnów – Leluchów on section from existing km 87+700 to existing km 90+345 and at Nowy Sącz station